What was found
DURING C-CHECK, FLOORBEAM AT STA 940, RIGHT HAND LIGHTENING HOLE CRACKED. REMOVED FASTENER AT END OF CRACK, OVERSIZED HOLE TO .248, FABRICATED DOUBLER ALODINED AND PRIMED. INSTALLED DOUBLER PER SRM 51-01-08 AND EO 25260-5108.