What was found
SKIN HAS TWO DRILL STARTS AT BS 255.5 WL 169 RT SIDE. FABRICATED SKIN DOUBLER PER FEDEX 53-30-1 AT BS 255.5 WL 169 RT SIDE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SKIN HAS TWO DRILL STARTS AT BS 255.5 WL 169 RT SIDE. FABRICATED SKIN DOUBLER PER FEDEX 53-30-1 AT BS 255.5 WL 169 RT SIDE.