What was found
CORROSION (C53-224-06) ON FLOORBEAM AT BS 620 RBL 10 TO 43 WL 208. REMOVED DAMAGED SECTION OF FLOORBEAM, FABRICATED REPAIR PARTS, CLEANED, TREATED AND INSTALLED PARTS. ALL WORK ACCOMPLISHED IAW FEDEX SRM 53-10-8 AT BS 620 RBL 10 TO 43 WL 208.