What was found
DURING C-CHECK, DURING COMPLIANCE OF AD 93-21-08, FOUND NR 2 PYLON SUPT FITTING CRACKED. REPLACED NR 2 PYLON SUPPORT FITTING PER DHL J/C 4525.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-CHECK, DURING COMPLIANCE OF AD 93-21-08, FOUND NR 2 PYLON SUPT FITTING CRACKED. REPLACED NR 2 PYLON SUPPORT FITTING PER DHL J/C 4525.