What was found
DURING D-CHECK, FOUND CORROSION ON UPPER SURFACE OF RIGHT RAM AIR PLENUM ABOVE RIGHT SECONDARY HEAT EXCHANGER. REMOVED FASTENERS PER SRM 51-30-2. CUT OUT 'L' ANGLE SUPPORT FOR ACCESS. REMOVED CORROSION PER SRM 51-10-6. ALODINED AND PRIMED PER SRM 51-10-2. FABRICATED TWO DOUBLERS 2024-T3 .080 3.75 INCH BY 13 INCH AND FILLER 3.75 BY 9 INCH. INSTALLED REPAIR AS PER SRM 57-30-3.