What was found
DURING D-CHECK, AFT BAGGAGE DITCHING WEB IS TORN AND CRACKED FS 1180 RBL 55. STOP DRILLED AT END OF CRACK AS PER SRM 51-10-1. FABRICATED DOUBLER 2024-T3 .025 6 INCH BY 3 INCH. INSTALLED DOUBLER REPAIR AS PER SRM 51-40-2.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING D-CHECK, AFT BAGGAGE DITCHING WEB IS TORN AND CRACKED FS 1180 RBL 55. STOP DRILLED AT END OF CRACK AS PER SRM 51-10-1. FABRICATED DOUBLER 2024-T3 .025 6 INCH BY 3 INCH. INSTALLED DOUBLER REPAIR AS PER SRM 51-40-2.