What was found
DURING D-CHECK, BS 480 FLOOR BEAM CAP IS CORRODED AT TWO NUT-CLIP LOCATIONS, BL ZERO AND RBL 10. CUT OUT DAMAGED AREA PER SRM 53-10-8, 13 INCH LENGTH OF CUT-OUT ALODINED AND PRIMED PER SRM 51-10-2. FABRICATED REPAIR PARTS PER SRM 53-10-3. ALODINED AND PRIMED PER SRM 51-10-2. INSTALLED REPAIR PARTS T-CHORD, 19 INCHES BY 2 INCHES BY 2 INCHES (BAC 1505-100617) ANGLE AND 7075-T6, .080 INCH AND .050 INCH 7075-T6 STRAP AND .080 INCH 7075-T6 AND .050 INCH 7075-T6. TAT: 45,788.3 HRS. TAC: 29,959.