What was found
ENGINE WAS INSPECTED FOR SUSPECTED OVERTEMPERATURE PER CREW REPORT. INSPECTION ACCOMPLISHED PER ROLLS ROYCE OVERHAUL MANUAL. RESULTS SHOWED NO OVERTEMPERATURE EFFECTS. PRIOR TO DISASSEMBLY, NOTED THE P2 TOWER ON THE FUEL FLOW REGULATOR WAS LOOSE. THREE MOUNTING BOLTS HAD PULLED OUT OF THE HOUSING. THE P2 PORT WAS EXPOSED TO ATMOSPHERE, LOSS OF P2 SIGNAL WOULD EFFECT THE ENGINE'S ABILITY TO CORRECTLY METER FUEL.