SDR 96ZZZX4063

Service difficulty report · Elt

Difficulty date
July 9, 1996
Submitted
March 26, 2000
Operation
General aviation
Part
Elt
Part number
E01
Condition
Misassembled
Location
Case Half
Component
Ack
Stage of operation
IN
Nature of condition
W
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

PRIOR TO INSTALLATION, AN ELT WAS NOTED TO BE HOT. INVESTIGATION FOUND 4 OF BATTERIES WERE SHORTED DUE MIS-ASSEMBLY OF THE ELT CASE HALVES. SUBMITTER STATES MIS-ASSEMBLY IS EASY TO DO WHEN BATTERY INSTALLATION INSTRUCTIONS NOT FOLLOWED.