What was found
FILTER PACKING WAS INSTALLED AT 150-HOUR NR 2 INTERIM INSP. O-RING HAD BEEN ROLLED DURING INSTALLATION 1.8 HRS. TOO SMALL OF SAFETY WIRE USED ON RT ENGINE ON FUEL FILTER BOWL ALSO.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FILTER PACKING WAS INSTALLED AT 150-HOUR NR 2 INTERIM INSP. O-RING HAD BEEN ROLLED DURING INSTALLATION 1.8 HRS. TOO SMALL OF SAFETY WIRE USED ON RT ENGINE ON FUEL FILTER BOWL ALSO.