What was found
AS TAKEOFF POWER WAS APPLIED, THE LEFT ENGINE EPR INDICATION WOULD NOT REACH TARGET EPR. CREW ABORTED TAKEOFF AND RETURNED TO THE GATE. MAINTENANCE PERFORMED LEAK CHECK OF LEFT ENGINE PT2, PT7 LINES AND REPLACED THE LEFT ENGINE EPR TRANSMITTER, LEAK AND OPERATIONAL CHECK OK.