What was found
DURING ASSEMBLY OF THIS ENGINE, 6 SHROUD TUBE SPRINGS WERE INSTALLED, 3 BROKE WHEN THE NUT WAS TIGHTENED. THESE SPRINGS WERE SUPPLIED AS PART OF A PACKET SET FROM SUPERIOR AIR PARTS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING ASSEMBLY OF THIS ENGINE, 6 SHROUD TUBE SPRINGS WERE INSTALLED, 3 BROKE WHEN THE NUT WAS TIGHTENED. THESE SPRINGS WERE SUPPLIED AS PART OF A PACKET SET FROM SUPERIOR AIR PARTS.