What was found
DURING C-4 INSPECTION, CORROSION WAS NOTED ON SHEAR TIES, FORWARD AND BACK SIDE OF FRAME 727A.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-4 INSPECTION, CORROSION WAS NOTED ON SHEAR TIES, FORWARD AND BACK SIDE OF FRAME 727A.