What was found
INSPECTION PRIOR TO INSTALLATION REVEALED SHEAR PAD TO BE DEBONDED. PART RECEIVED BAD FROM STOCK.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION PRIOR TO INSTALLATION REVEALED SHEAR PAD TO BE DEBONDED. PART RECEIVED BAD FROM STOCK.