As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING SERVICE CHECK AT ANC, RT WING NR 6 PLANK LEAP DOUBLER WAS DISCOVERED CRACKED AT RWS 257. CRACK RAN BETWEEN FASTENERS. VERIFIED RACK DID NOT CONTINUE BY BOLT HOLE EDDY CURRENT AFTER FASTENER REMOVAL. REPAIRED BY PATCHING PER DRAWING NR C95-R02 AND SEALED PER MM, CHAPTER 51-2-16.