What was found
CORROSION MAIN CARGO FLOORBEAM BS 620 AT LBL 45.5 AND 2 HOLES CORRODED BETWEEN LBL 45.5 AND LBL 24.75 FWD SIDE OF FLOORBEAM UPPER CHORD. NOTE: 2 HOLES BETWEEN LBL 24.5 AND LBL 45.5 ARE NOT MAJOR REPAIRS. REPAIR CORROSION DAMAGE AT LBL 45.5 BS 620 PER AARD 53-10-07-2 FIG 1 AND REMOVED CORROSION ON 2 HOLES BETWEEN LBL 45.5 AND LBL 24.75 PER 51-10-6. ALODINED AND PRIMED PER MM 51-20-0.