What was found
OVERHAULED ALTERNATOR FROM ELECTROSYSTEMS FAILED 3 HOURS INTO FIRST FLIGHT AFTER INSTALLING. (INTERNAL FAILURE).
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
OVERHAULED ALTERNATOR FROM ELECTROSYSTEMS FAILED 3 HOURS INTO FIRST FLIGHT AFTER INSTALLING. (INTERNAL FAILURE).