What was found
FUSELAGE STATION 1812.63. PRODUCTION SPLICE OF LONGERON NR 46 RT. AFT SECTION AT SPLICE, P.N AGA7039-1, HAS 200 MM LONG CRACKS IN THE RADIUS OF WEB-TO-CROWN. CRACKS ARE MOST LIKELY CAUSED BY STRESS CORROSION. INSTALL SHIMS TO PREVENT PRE-LOAD (IN PRODUCTION AND IN REPAIRS). APPLY CORROSION PROTECTION PER SRM 51.