What was found
NEW CESSNA WITH 50.0 HOURS, WHILE ACCOMPLISHING A PHASE 1 INSPECTION, THE COPILOT'S INBOARD SEAT RAIL HAD ONE OF THE EIGHT BOLTS MOUNTING THE SEAT RAIL TO THE FLOOR CROSS THREADED INTO ITS NUTPLATE AND THE BOLT HEAD LACKED .1250 INCH FROM BEING SEATED.