What was found
INSTALLED 3-19-99 AT 2,216.2 HOBBS. END BROKE OFF 5-14-99 AT 2,299.4. MIXTURE CONTROL CABLE FAILED ON RIGHT ENGINE. 83.2 HOURS/2 MONTHS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSTALLED 3-19-99 AT 2,216.2 HOBBS. END BROKE OFF 5-14-99 AT 2,299.4. MIXTURE CONTROL CABLE FAILED ON RIGHT ENGINE. 83.2 HOURS/2 MONTHS.