What was found
DURING WALK-AROUND INSPECTION, NR 3 FAIRING CANOE WAS FOUND PIERCED WITH FLAP PUSH ROD. ON INVESTIGATION AFTER DROPPING THE FLAPS (T/E), FOUND THE FLAP PUSH ROD HAD SHEARED ON THE FORWARD END. THE BROKEN PUSH ROD PIERCED THE FAIRING DURING FLAP RETRACTION. PRELIMINARY INSPECTION FOUND PUSH ROD ON NR 4 FAIRING ALSO DAMAGED. PUSH RODS REMOVED AND REPLACED PER PAC MM AND AIRCRAFT RETURNED TO SERVICE.