What was found
DURING 25-HOUR AD INSPECTION. 50-HOUR PMI LAST 50-HOUR INSPECTION DONE AT 2,867.5 HOURS. AFT LAMINATE OF NR 6 DISC PACK CRACKED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 25-HOUR AD INSPECTION. 50-HOUR PMI LAST 50-HOUR INSPECTION DONE AT 2,867.5 HOURS. AFT LAMINATE OF NR 6 DISC PACK CRACKED.