What was found
UPON ENGAGING THROTTLE THE LT ENGINE WOULD NOT SPEED TO TAKEOFF POWER. BOTH PT2 LINES ON NR 1 AND NR 2 ENGINE BLOCKED. CLEARED BLOCKAGE AND CHECKED BNUT CONNECTIONS, OCK, OK ON ENGINE RUN IAW MM. ALSO TRIMMED NR 1 AND NR 2 ENGINE., AND OCK, IAW MM.