What was found
UPON ARRIVAL, WHEN CONDITION LEVERS ADVANCE TO MAXIMINUM, LT PROP SPEED WAS APPROXIMATELY 68 PERCENT, LT TORQUE WOULD NOT DECREASE BELOW 60 PERCENT. MAINTENANCE RAN ENGINE TO FULL POWER TO ENSURE PROPER OPERATION. OPS CHECK GOOD. INSPECTED CONTROL CABLES FOR FULL MOVEMENT AND SECURITY. NO DEFECTS NOTED. FERRIED, MECHANICS FOUND PCU, CSU AND FEA SOLENOID CONNECTOR PLUG COATED IN OIL. CLEANED.