What was found
TEMPORARY REPAIR ON RT FORWARD FUSELAGE SKIN JUST FORWARD OF FS 202.75 BULKHEAD, DENT 4 INCH LOG BY .062 INCH DEEP, TEMP REPAIR WS PERFORMED PER REO 601R-53-11-327. COMPLIED WITH STEPS 1 THROUGH 3 OF WVAC EO NR 601R-53-4413. PERFORMED EDDY CURRENT INSPECTION TO COMPLY WITH STEP 24 OF WVAC EO 601R-53-4413 OF RIGHT FWD FUSELAGE REPAIR. NO INDICATIONS NOTED AT THIS TIME. COMPLIED WITH STEPS 5 AND 6 OF WVAC EO 601R-53-4413. (M)