What was found
LT T/R UPPER INBD CASCADE CRACKED. REPAIRED LT T/R UPPER INBD CASCADE IAW PROCESS SPECIFICATION 1, DWG AW78-30-0711-04.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LT T/R UPPER INBD CASCADE CRACKED. REPAIRED LT T/R UPPER INBD CASCADE IAW PROCESS SPECIFICATION 1, DWG AW78-30-0711-04.