What was found
LEFT FUSELAGE 3 INCH GOUGE DAMAGE AT FS 409+16 & WK 73.50. CUT OUT DAMAGE, FABRICATED REPAIR DOUBLER & FILLER, NDT CUTOUT, APPLIED CORROSION PREVENTION TREATMENT, PRIMER SURFACE TREATMENT, FAY & FILLET SEALED, INSTALLED REPAIR DOUBLER & FILLER, RESTORED TOP COAT.