What was found
FLOOR SUPPORT BEAM AT 280 RBL 9 IS CRACKED INBD & OTBD CLIPS. REMOVED CRACKED CLIPS & INSTALLED SERVICEABLE CLIPS IAW CRJ200 SRM 51-21-11, 51-25-06, 51-40-11 & 51-42-21.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FLOOR SUPPORT BEAM AT 280 RBL 9 IS CRACKED INBD & OTBD CLIPS. REMOVED CRACKED CLIPS & INSTALLED SERVICEABLE CLIPS IAW CRJ200 SRM 51-21-11, 51-25-06, 51-40-11 & 51-42-21.