What was found
CRACK WAS DISCOVERED IN THE AFT PRESSURE BULKHEAD FS621, LB 27.50, 103.50 WL DURING SCHEDULED SDI OF THE AFT PRESSURE BULKHEAD. CRACK WAS REPAIRED PER REO 601R-53-61-1285.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CRACK WAS DISCOVERED IN THE AFT PRESSURE BULKHEAD FS621, LB 27.50, 103.50 WL DURING SCHEDULED SDI OF THE AFT PRESSURE BULKHEAD. CRACK WAS REPAIRED PER REO 601R-53-61-1285.