What was found
AFW - FOUND CORROSION IN HOLES AT AFT ATTACH OF RIGHT FLAP 9-10 BEAM. HOLES CLEANED UP BEYOND DIAMETER LISTED IN AARD 27-50-00-01. VISUALLY INSPECT BORES TO ENSURE CORROSION REMOVAL. FABRICATED BUSHINGS OF A1-N1-BR TO ACHIEVE MIN .001 INCH INTERFERENCE PIT, ALODINE AND INSTALLED WET W/BMS 5-95, REAM BORE BUSHING TO ORIGINAL HOLE DIAMETER. FABRICATED REPAIR WASHERS FROM .125 INCH THICK CRES WITH O/D OF .75, REFINISH REPAIR WASHER PER AARD 51-20-01-1. INSTALL WASHER IN PLACE OF ORIGINAL WASHERS. INSTALL FLAP PER 767 AMM. (M)