What was found
DURING ACCOMPLISHMENT OF ENGINEERING REQUEST OT CHEKC GIRT BAR SPRINGS AT EACH PASSENGER DOOR POSITION, SIX GIRT BAR SPRINGS NEED REPLACEMENT. REPLACED SIX GIRT BAR SPRINGS. SYSTEM GROUND CHECKED NROMAL OPERATION. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING ACCOMPLISHMENT OF ENGINEERING REQUEST OT CHEKC GIRT BAR SPRINGS AT EACH PASSENGER DOOR POSITION, SIX GIRT BAR SPRINGS NEED REPLACEMENT. REPLACED SIX GIRT BAR SPRINGS. SYSTEM GROUND CHECKED NROMAL OPERATION. (M)