What was found
TUL - FLOOR CHANNEL SUPPORT CORRODED AT RT RIB LINE NUMBER 38 AT STATION 316 TO 324 IN AN AREA OF 1 INCH BY 3 INCHES. DRILLED UP NEW INTERCOSTAL, DEBURRED, TREATED, PRIMED AND PAINTED AND INSTALLED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
TUL - FLOOR CHANNEL SUPPORT CORRODED AT RT RIB LINE NUMBER 38 AT STATION 316 TO 324 IN AN AREA OF 1 INCH BY 3 INCHES. DRILLED UP NEW INTERCOSTAL, DEBURRED, TREATED, PRIMED AND PAINTED AND INSTALLED.