What was found
PAN CRACKED AT LOWER HINGE ON FORWARD SERVICE DOOR. DYE CHECKED AND STOP DRILLED CRACK. INSTALLED REPAIR DOUBLER PER ESO 80177.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PAN CRACKED AT LOWER HINGE ON FORWARD SERVICE DOOR. DYE CHECKED AND STOP DRILLED CRACK. INSTALLED REPAIR DOUBLER PER ESO 80177.