What was found
SHEAR TIE CRACKED AT STATION 1451 FRAME AT LONGERON 2 RIGHT. INSTALLED A SERVICEABLE SHEAR TIE PER SRM 53-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHEAR TIE CRACKED AT STATION 1451 FRAME AT LONGERON 2 RIGHT. INSTALLED A SERVICEABLE SHEAR TIE PER SRM 53-01.