What was found
FORWARD CARGO INTERCOSTAL VERTICAL SUPPORTS CRACKED FROM STATIONS 660 TO 680 LEFT BUTTLINE 45.5. REMOVED AND REPLACED INTERCOSTAL. RE-ATTACHED POTABLE WATER LINE AND DRAIN LINE TO S-LAVATORY PER SRM 51-10-02-0G PARAGRAPH 9.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FORWARD CARGO INTERCOSTAL VERTICAL SUPPORTS CRACKED FROM STATIONS 660 TO 680 LEFT BUTTLINE 45.5. REMOVED AND REPLACED INTERCOSTAL. RE-ATTACHED POTABLE WATER LINE AND DRAIN LINE TO S-LAVATORY PER SRM 51-10-02-0G PARAGRAPH 9.