What was found
CABIN FORWARD SUBFLOOR CRACKED AT FASTENER STATIONS 179, 26 INCHES RIGHT OF CENTER LINE. INSTALLED DOUBLER PER AARD 53-20-00-16.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CABIN FORWARD SUBFLOOR CRACKED AT FASTENER STATIONS 179, 26 INCHES RIGHT OF CENTER LINE. INSTALLED DOUBLER PER AARD 53-20-00-16.