What was found
SHEAR TIE AT STATION 610 BETWEEN STRINGERS 37 AND 38 LEFT HAS CORROSION. REPLACED SHEAR TIE PER SRM 53-00-07.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHEAR TIE AT STATION 610 BETWEEN STRINGERS 37 AND 38 LEFT HAS CORROSION. REPLACED SHEAR TIE PER SRM 53-00-07.