What was found
NUMBER 5 LEADING SLAT STARTING TO DISBOND. ACCOMPLISHED BONDED REPAIR PER SRM 57-43-02-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NUMBER 5 LEADING SLAT STARTING TO DISBOND. ACCOMPLISHED BONDED REPAIR PER SRM 57-43-02-01.