What was found
CENTER TANK - LEFT BATHTUB FITTING IS LEAKING AT STATION 870 LEFT SIDE OF KEEL BEAM BOX FORWARD OF THE WHEEL WELL. INSTALLED NEW FORWARD AND AFT LEFT BATHTUB FITTINGS PER AARD 51-00-05-1.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CENTER TANK - LEFT BATHTUB FITTING IS LEAKING AT STATION 870 LEFT SIDE OF KEEL BEAM BOX FORWARD OF THE WHEEL WELL. INSTALLED NEW FORWARD AND AFT LEFT BATHTUB FITTINGS PER AARD 51-00-05-1.