Service difficulty report · Pump · Doug DC983

Difficulty date
November 25, 2013
Submitted
December 13, 2013
Operation
Air carrier
Aircraft
N9618A
Make and model
Doug DC983
Aircraft serial
53565
Aircraft time
46,856 hours, 22,232 cycles
Part
Pump
Condition
Failed
Location
Fuel System
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CLT CREW REPORTED CNTR TANK BOOST PUMP CIRCUIT BREAKER POPPED. FLIGHT RETURNED CLT LANDED WITHOUT INCIDENT. PLACARDED CNTR TANK BOOST PUMP INOPERATIVE IAW MEL. FLIGHT CONTINUED TO DESTINATION. REPLACED AFT CNTR FUEL BOOST PUMP AT DFW ON A2/02/2013. SYSTEM GROUND CHECKED NORMAL OPERATION CLOSED.

More about the Doug DC-9-83