Service difficulty report · Check Valve · Boeing 767323

Difficulty date
April 11, 2014
Submitted
April 17, 2014
Operation
Air carrier
Aircraft
N363AA
Make and model
Boeing 767323
Aircraft serial
24044
Aircraft time
106,114 hours, 17,176 cycles
Part
Check Valve
Condition
Worn
Location
Fuel System
Stage of operation
CR
How discovered
O
Nature of condition
K
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

SJU INFLIGHT GIG JFK. CREW REPORTED UNCONTROLLED TRANSFER OF FUEL FROM RT MAIN TANK TO CTR TANK. EMERGENCY DECLARED FLIGHT DIVERTED SJU & LANDED WITHOUT INCIDENT. ACFT REMOVED FROM SERVICE. REPLACED RT CTR AUXILIARY LEAK DISCHARGE CHECK VLV & RT OVERRIDE PUMP MPN 5006286G. SYS GND CHECKED NORMAL, OPERATION CLOSED.