What was found
EMERGENCY DECLARED, LANDING UNEVENTFUL. DURING APPROACH TE FLAPS STOPPED AT LESS THAN 1 DEGREE WITH FLAP HANDLE AT 5 DEGREES. FLAPS EXTENDED VIA ALTERNATE SYS. NORMAL SINK RATE, TOUCHDOWN & BRAKING. PERFORMED BITE OF BOTH SMD COMPUTER 1 & 2 IAW MM 27-32-00 & FOUND LE ASYMMETRY FAULT MSG 27-31006 ON BOTH SMDS. R & R FLAP SLAT ELECTRONICS UNIT IAW MM 27-51-01. ACCOMPLISHED LAP LOAD RELIEF TEST IAW FIM 27-51-00 & OPERATED FLAPS SEVERAL TIMES. SYS CHECKED NORMAL.