What was found
AIR INTERRUPT, EMER DECLARED, LANDING UNEVENTFUL & ACFT OVERWEIGHT. DURING CLIMB CREW HAD DIFFICULTY TURNING LT, AT LEVEL OFF RUDDER REQUIRED 8 UNITS OF LT TRIM. R & R RUDDER TRIM CONTROL INDICATOR & PERFORMED OPERATIONAL CHECK IAW AMM 27-10-07. SYS CHECKED NORMAL.