What was found
13WL EPSU FAILED A CHECK EMER LIGHTS OPERATIONAL TEST. ACFT WAS GNDED. REPLACED FIN NR 13WL EMER LIGHTING BATTERY PACK IAW AMM 33-51-38.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
13WL EPSU FAILED A CHECK EMER LIGHTS OPERATIONAL TEST. ACFT WAS GNDED. REPLACED FIN NR 13WL EMER LIGHTING BATTERY PACK IAW AMM 33-51-38.