Service difficulty report · Pressure Switch · Airbus A319112

Difficulty date
September 8, 2015
Submitted
September 12, 2015
Operation
Air carrier
Aircraft
N745VJ
Make and model
Airbus A319112
Aircraft serial
1289
Aircraft time
40,554 hours, 26,520 cycles
Part
Pressure Switch
Condition
Failed
Location
Center Tank
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CENTER TANK NR 1 FUEL PUMP FAULT ON CLIMB OUT. REPLACED THE CTR TANK NR 1 FUEL PUMP, BUT THE FAULT REOCCURRED ON THE NEXT FLIGHT. REPLACED THE PRESSURE SWITCH IAW AMM 28-21-15 & ACCOMPLISHED A SATISFACTORY OPERATIONAL CHECK.

More about the Airbus A319-112