What was found
AIRCRAFT WAS NOT GNDED. EMER POWER SUPPLY UNIT 11WL FAILED OPERATIONAL TEST. R & R EMER POWER SUPPLY UNIT 11WL. ACCOMPLISHED OPERATIONAL TEST IAW AMM 33-51-38-400-001-A. SYS CHECKED NORMAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
AIRCRAFT WAS NOT GNDED. EMER POWER SUPPLY UNIT 11WL FAILED OPERATIONAL TEST. R & R EMER POWER SUPPLY UNIT 11WL. ACCOMPLISHED OPERATIONAL TEST IAW AMM 33-51-38-400-001-A. SYS CHECKED NORMAL.