What was found
ON SERVICE CHECK, CIDS TEST FAILED FIN 15WL POWER SUPPLY UNIT. REPLACED THE BATTERY IAW SRM 33-58-00. ACCOMPLISEHED SATISFACTORY OPERATIONAL CHECK.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ON SERVICE CHECK, CIDS TEST FAILED FIN 15WL POWER SUPPLY UNIT. REPLACED THE BATTERY IAW SRM 33-58-00. ACCOMPLISEHED SATISFACTORY OPERATIONAL CHECK.