What was found
CORROSION ON FORWARD MAIN CABIN FLOOR DOUBLER AT -Y345 BETWEEN FRAMES 15 AND 16. REPLACED THE DOUBLER IAW 53-00-00, REPAIR 3, SRM 51-12-01, 51-10-03, 51-41-02, AND 51-40-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CORROSION ON FORWARD MAIN CABIN FLOOR DOUBLER AT -Y345 BETWEEN FRAMES 15 AND 16. REPLACED THE DOUBLER IAW 53-00-00, REPAIR 3, SRM 51-12-01, 51-10-03, 51-41-02, AND 51-40-02.