What was found
DURING TAKEOFF AT 60KTS, GREEN RESERVOIR OVERHEAT MESSAGE ILLUMINATED. ABORTED THE TAKEOFF, MAINTENANCE ACCOMPLISHED SATISFACTORY OPERATIONAL CHECK OF GREEN HYDRAULIC SYSTEM IAW AMM 29-11-00.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING TAKEOFF AT 60KTS, GREEN RESERVOIR OVERHEAT MESSAGE ILLUMINATED. ABORTED THE TAKEOFF, MAINTENANCE ACCOMPLISHED SATISFACTORY OPERATIONAL CHECK OF GREEN HYDRAULIC SYSTEM IAW AMM 29-11-00.