Service difficulty report · Pump · Airbus A319112

Difficulty date
February 18, 2018
Submitted
February 22, 2018
Operation
Air carrier
Aircraft
N703UW
Make and model
Airbus A319112
Aircraft serial
904
Aircraft time
51,890 hours, 29,895 cycles
Part
Pump
Condition
Malfunctioned
Location
Fuel
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CENTER TANK PUMP 2 INOPERATIVE SHORTLY AFTER TAKE OFF. MAINTENANCE COULD NOT DUPLICATE FAULT, RESET CIRCUIT BREAKER, AND PERFORMED SATISFACTORY OPERATIONAL CHECK.

More about the Airbus A319-112